Certificate Issuance Processing Times
Certificate issuance times vary by academic year, campus, and faculty. The applicable processing period excludes specified non-working days.
2026: Faculty of Systems Design and Technology
At Tokyo Senju Campus, certificates are generally issued seven days after the application date. Saturdays, Sundays, and public holidays are excluded from this period.
2026: Faculty of Science and Technology
At Hatoyama Campus, the number of days shown as the issuance period does not include days when the administrative office does not handle applications.
2025: Faculty of Engineering
At Tokyo Senju Campus, certificates are generally issued three days after the application date. Saturdays, Sundays, and public holidays are excluded from this period.
Official sources
The following official Tokyo Denki University materials were used to prepare this page.
- 2025 Student Handbook — School of Engineering (2025 academic year) — PDF page 220
- 2026 Student Handbook — School of System Design and Technology (2026 academic year) — PDF page 148
- 2026 Student Handbook — School of Science and Engineering (2026 academic year) — PDF page 219